207
edits
Line 23: | Line 23: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: 4 (2 in March and 2 in May or June) | ||
* Essential diagnostic systems: | * Essential diagnostic systems:Pellet Injector and Fast frame imaging camera with fibre bundle connected to A8:TANGENTIAL and B2:TOP | ||
* Type of plasmas (heating configuration): | * Type of plasmas (heating configuration): ECH and NBI (standard configuration is best) | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: Recent lithium and boron coatings | ||
* External users: | * External users: No | ||
* Any external equipment to be integrated? | * Any external equipment to be integrated? Fast-frame camera as in spring 2020 | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == |
edits