TJ-II: Pellet induced Enhanced Confinement: the role of Er and turbulence: Difference between revisions

Line 26: Line 26:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 4 days in total: 2 days (scan in NBI power and magnetic configuration) and 2 days for LCR studies
* Number of plasma discharges or days of operation: 2 days (scan in NBI power and magnetic configuration)  
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Langmuir Probes
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam
* Type of plasmas (heating configuration): ECRH, NBI
* Type of plasmas (heating configuration): ECRH, NBI
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:
90

edits