== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 2 days (if possible to make scan in NBI power and magnetic configuration)
* Number of plasma discharges or days of operation: 4 days in total: 2 days (scan in NBI power and magnetic configuration) and 2 days for LCR studies
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam.
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam.
* Type of plasmas (heating configuration): NBI#1, NIB#2 and NBI#1+2
* Type of plasmas (heating configuration): NBI#1, NIB#2 and NBI#1+2