345
edits
Line 31: | Line 31: | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: 2 | * Number of plasma discharges or days of operation: 2 | ||
* Essential diagnostic systems: edge probes, fast | * Essential diagnostic systems: edge probes, fast camera with triple bundle, HIBP, Doppler and edge biasing | ||
* Type of plasmas (heating configuration): NBI where the density limit will be surpassed during density ramps | * Type of plasmas (heating configuration): NBI where the density limit will be surpassed during density ramps | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: |
edits