207
edits
Line 24: | Line 24: | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: 5 days | * Number of plasma discharges or days of operation: 5 days | ||
* Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, microwave interferometer, HIBPs | * Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, microwave interferometer, HIBPs, Doppler Reflectrometer. | ||
* Type of plasmas (heating configuration): ECRH and NBI, 100_24_58 to 100_54_66 | * Type of plasmas (heating configuration): ECRH and NBI, 100_24_58 to 100_54_66 | ||
* Specific requirements on wall conditioning if any: Good plasma control | * Specific requirements on wall conditioning if any: Good plasma control |
edits