TJ-II:PelletFuelling: Difference between revisions

Jump to navigation Jump to search
Line 24: Line 24:
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 5 days
* Number of plasma discharges or days of operation: 5 days
* Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, microwave interferometer, HIBPs
* Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, microwave interferometer, HIBPs, Doppler Reflectrometer.
* Type of plasmas (heating configuration): ECRH and NBI, 100_24_58 to 100_54_66  
* Type of plasmas (heating configuration): ECRH and NBI, 100_24_58 to 100_54_66  
* Specific requirements on wall conditioning if any: Good plasma control
* Specific requirements on wall conditioning if any: Good plasma control
207

edits

Navigation menu