207
edits
Line 23: | Line 23: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: 5 days | ||
* Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, interferometer, HIBPs | * Essential diagnostic systems: Pellet Injector, fast camera, Thomson scattering, microwave interferometer, HIBPs | ||
* Type of plasmas (heating configuration): 100_24_58 to 100_54_66 | * Type of plasmas (heating configuration): ECRH and NBI, 100_24_58 to 100_54_66 | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: Good plasma control | ||
* External users: need a local computer account for data access: yes/no | * External users: need a local computer account for data access: yes/no | ||
* Any external equipment to be integrated? Provide description and integration needs: | * Any external equipment to be integrated? Provide description and integration needs: |
edits