TJ-II: Difference between revisions

Jump to navigation Jump to search
135 bytes added ,  24 November 2010
no edit summary
No edit summary
No edit summary
Line 1: Line 1:
=[http://egebyromedu.co.cc Under Construction! Please Visit Reserve Page. Page Will Be Available Shortly]=
[[File:TJII_model.jpg|500px|thumb|right|TJ-II Model]]
[[File:TJII_model.jpg|500px|thumb|right|TJ-II Model]]


Line 10: Line 11:


The flexible Heliac TJ-II was designed on the basis of calculations performed by the team of physicists and engineers of [[CIEMAT]], in collaboration with the Oak Ridge National Laboratory ([http://en.wikipedia.org/wiki/ORNL ORNL], USA) and the Institut für PlasmaPhysik at Garching ([http://en.wikipedia.org/wiki/Max-Planck-Institut_f%C3%BCr_Plasmaphysik IPP], Germany).
The flexible Heliac TJ-II was designed on the basis of calculations performed by the team of physicists and engineers of [[CIEMAT]], in collaboration with the Oak Ridge National Laboratory ([http://en.wikipedia.org/wiki/ORNL ORNL], USA) and the Institut für PlasmaPhysik at Garching ([http://en.wikipedia.org/wiki/Max-Planck-Institut_f%C3%BCr_Plasmaphysik IPP], Germany).
<ref>[http://www.ornl.gov/info/reports/1987/3445602635147.pdf T.C. Hender et al, ''Studies of a flexible heliac configuration'', Report ORNL/TM-10374 (1987) OSTI ID: 6007697]</ref>
&lt;ref&gt;[http://www.ornl.gov/info/reports/1987/3445602635147.pdf T.C. Hender et al, ''Studies of a flexible heliac configuration'', Report ORNL/TM-10374 (1987) OSTI ID: 6007697]&lt;/ref&gt;
The TJ-II project received preferential support from [[Euratom]] for phase I (Physics) in 1986 and for phase II (Engineering) in 1990. The [[TJ-II:Construction|construction of this flexible Heliac]] was carried out in parts according to its constitutive elements, which were commissioned to various European companies, although 60% of the investments reverted back to Spanish companies.
The TJ-II project received preferential support from [[Euratom]] for phase I (Physics) in 1986 and for phase II (Engineering) in 1990. The [[TJ-II:Construction|construction of this flexible Heliac]] was carried out in parts according to its constitutive elements, which were commissioned to various European companies, although 60% of the investments reverted back to Spanish companies.


Line 18: Line 19:


TJ-II is the third magnetic confinement device in a series. In 1983, the device [[TJ-I]] was taken into operation.
TJ-II is the third magnetic confinement device in a series. In 1983, the device [[TJ-I]] was taken into operation.
The denomination of this device is due to the abbreviation of "Tokamak de la Junta de Energía Nuclear", this being the former denomination of [[CIEMAT]]. The abbreviation was maintained for successive devices for administrative reasons.
The denomination of this device is due to the abbreviation of &quot;Tokamak de la Junta de Energía Nuclear&quot;, this being the former denomination of [[CIEMAT]]. The abbreviation was maintained for successive devices for administrative reasons.


In 1994, the torsatron [[TJ-IU]] was taken into operation. This was the first magnetic confinement device entirely built in Spain. Currently, [[TJ-IU]] is located at the [http://www.ipf.uni-stuttgart.de/index_e.html University of Stuttgart] in Germany under the name of TJ-K.
In 1994, the torsatron [[TJ-IU]] was taken into operation. This was the first magnetic confinement device entirely built in Spain. Currently, [[TJ-IU]] is located at the [http://www.ipf.uni-stuttgart.de/index_e.html University of Stuttgart] in Germany under the name of TJ-K.
Line 109: Line 110:


== References ==
== References ==
<references />
&lt;references /&gt;
24

edits

Navigation menu