154
edits
Garciacortes (talk | contribs) |
|||
Line 27: | Line 27: | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: 2 days (scan in NBI power and magnetic configuration) | * Number of plasma discharges or days of operation: 2 days (scan in NBI power and magnetic configuration) | ||
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam | * Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection | ||
* Type of plasmas (heating configuration): ECRH, NBI | * Type of plasmas (heating configuration): ECRH, NBI | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: Good control of NBI heated plasmas | ||
* External users: need a local computer account for data access: | * External users: need a local computer account for data access: no | ||
* Any external equipment to be integrated? | * Any external equipment to be integrated? No: | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == |
edits