TJ-II: Pellet induced Enhanced Confinement: the role of Er and turbulence: Difference between revisions

Line 27: Line 27:
Required resources:
Required resources:
* Number of plasma discharges or days of operation:  2 days (scan in NBI power and magnetic configuration)  
* Number of plasma discharges or days of operation:  2 days (scan in NBI power and magnetic configuration)  
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection
* Type of plasmas (heating configuration): ECRH, NBI
* Type of plasmas (heating configuration): ECRH, NBI
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any: Good control of NBI heated plasmas
* External users: need a local computer account for data access: yes/no
* External users: need a local computer account for data access: no
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? No:


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
154

edits