148
edits
(2 intermediate revisions by 2 users not shown) | |||
Line 32: | Line 32: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: 3 days (scan in NBI scenarios: Co, CNTR and balanced) | * Number of plasma discharges or days of operation: 3 days (scan in NBI scenarios: Co, CNTR and balanced) and 2 days for scan in magnetic configuration. | ||
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection | * Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection | ||
* Type of plasmas (heating configuration): ECRH, NBI | * Type of plasmas (heating configuration): ECRH, NBI | ||
* Specific requirements on wall conditioning if any: Good control of NBI heated plasmas | * Specific requirements on wall conditioning if any: Good control of NBI heated plasmas. Recent lithium and boron wall coatings | ||
* External users: need a local computer account for data access: no | * External users: need a local computer account for data access: no | ||
* Any external equipment to be integrated? No: | * Any external equipment to be integrated? No: | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == | ||
Preferred dates: ( | Preferred dates: (March when NBI is well conditioned) | ||
<!-- DO NOT REMOVE THE FOLLOWING LINES --> | <!-- DO NOT REMOVE THE FOLLOWING LINES --> | ||
== References == | == References == | ||
<references /> | <references /> |
edits