==Commisioning and operation plan==
==Commisioning and operation plan==


To minimize the accelerator activation, the commissioning will be performed mainly with H<sup>2+</sup> pulsed beams with progressively increasing duty factor and current up to the nominal 125 mA current. Therefore the beam dump must be able to stop deuteron and H<sup>2+</sup> continuous and pulsed beams with energies 5 MeV (RFQ commissioning) and 9 MeV. The maximum beam power is 1.12 MW corresponding to a beam current of 125 mA. A maximum operation time at full current of D+ of around 1 year and an operation time with 5 Hz pulsed beam with 0.1% duty cycle of 2 months have been assumed.
To minimize the accelerator activation, the commissioning will be performed mainly with H<sup>2+</sup> pulsed beams with progressively increasing duty factor and current up to the nominal 125 mA current. Therefore the beam dump must be able to stop deuteron and H<sup>2+</sup> continuous and pulsed beams with energies 5 MeV (RFQ commissioning) and 9 MeV. The maximum beam power is 1.12 MW corresponding to a beam current of 125 mA. A maximum operation time at full current of D<sup>+</sup> of around 1 year and an operation time with 5 Hz pulsed beam with 0.1% duty cycle of 2 months have been assumed.


==References==
==References==
<references />
<references />