TJ-II:Imaging of pelet cloud dynamics in TJ-II using Halpha and bremsstraahlung filters and a fast-frame camera: Difference between revisions

Line 23: Line 23:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation:  
* Number of plasma discharges or days of operation: 4 (2 in March and 2 in May or June)
* Essential diagnostic systems:
* Essential diagnostic systems:Pellet Injector and Fast frame imaging camera with fibre bundle connected to A8:TANGENTIAL and B2:TOP
* Type of plasmas (heating configuration):
* Type of plasmas (heating configuration): ECH and NBI (standard configuration is best)
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any: Recent lithium and boron coatings
* External users: need a local computer account for data access: yes/no
* External users: No
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? Fast-frame camera as in spring 2020


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
207

edits