CFETR: Difference between revisions
Jump to navigation
Jump to search
m (typo) |
(intro sentence for machine configuration) |
||
Line 2: | Line 2: | ||
== Machine configuration == | == Machine configuration == | ||
CFETR is designed as a superconducting [[tokamak|tokamak]]. | |||
{| class="wikitable" align="center" border="1" | {| class="wikitable" align="center" border="1" |
Revision as of 20:32, 23 November 2015
CFETR is China's approach to an experimental fusion test reactor facility. The China Fusion Engineering Test Reactor (CFETR) will be of similar size to ITER and is envisaged to start construction in 2020 and operation in 2030.
Machine configuration
CFETR is designed as a superconducting tokamak.
Parameter | Value |
---|---|
Major radius, R0 (m) | 5.7 |
Minor radius, a (m) | 1.6 |
Toroidal field, BT (T) | 4.5 - 5 |
Plasma current, Ip (MA) | 8 - 10 |
Edge safety factor, q95 | 3 |
Normalised beta, βN | 2.0 |
References
The Magnetic Fusion Program in China - Roadmap and Progress, December 2014