CFETR is China's approach to an experimental fusion test reactor facility. The China Fusion Engineering Test Reactor (CFETR) will be of similar size to [[ITER]] and is envisaged to start construction in 2020 and operation in 2030. | CFETR is China's approach to an experimental fusion test reactor facility. The China Fusion Engineering Test Reactor (CFETR) will be of similar size to [[ITER]] and is envisaged to start construction in 2020 and operation in 2030. | ||
== Machine configuration == | |||
{| class="wikitable" align="center" border="1" | |||
!''Parameter'' !!''Value'' | |||
|- | |||
|Major radius, R<sub>0</sub> (m) || 5.7 | |||
|- | |||
|Minor radius, a (m) || 1.6 | |||
|- | |||
|Toroidal field at R<sub>0</sub>, B<sub>T</sub> (T) || 4.5 - 5 | |||
|- | |||
|Plasma current, I<sub>p</sub> (MA) || 8 - 10 | |||
|- | |||
|Edge safety factor, q<sub>95</sub> || 3 | |||
|- | |||
|[[Beta|Normalised beta]], β<sub>N</sub> || 2.0 | |||
|} | |||
== References == | == References == | ||
[http://fire.pppl.gov/FPA14_Chinese_CFETR_Wan.pdf The Magnetic Fusion Program in China - Roadmap and Progress, December 2014] | [http://fire.pppl.gov/FPA14_Chinese_CFETR_Wan.pdf The Magnetic Fusion Program in China - Roadmap and Progress, December 2014] |
Revision as of 20:25, 23 November 2015
CFETR is China's approach to an experimental fusion test reactor facility. The China Fusion Engineering Test Reactor (CFETR) will be of similar size to ITER and is envisaged to start construction in 2020 and operation in 2030.
Machine configuration
Parameter | Value |
---|---|
Major radius, R0 (m) | 5.7 |
Minor radius, a (m) | 1.6 |
Toroidal field at R0, BT (T) | 4.5 - 5 |
Plasma current, Ip (MA) | 8 - 10 |
Edge safety factor, q95 | 3 |
Normalised beta, βN | 2.0 |
References
The Magnetic Fusion Program in China - Roadmap and Progress, December 2014