TJ-II:Power supply: Difference between revisions

From FusionWiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 8: Line 8:
<ref>[http://dx.doi.org/10.1109/FUSION.1995.534410 A. Pérez et al, '' Power supply for the Spanish Stellarator TJ-II, design, construction and tests'', Fusion Engineering, Proc. SOFE 1995. ''Seeking a New Energy Era'', 16<sup>th</sup> IEEE/NPSS Symposium, '''2''' (1995) 1066-1069]</ref>
<ref>[http://dx.doi.org/10.1109/FUSION.1995.534410 A. Pérez et al, '' Power supply for the Spanish Stellarator TJ-II, design, construction and tests'', Fusion Engineering, Proc. SOFE 1995. ''Seeking a New Energy Era'', 16<sup>th</sup> IEEE/NPSS Symposium, '''2''' (1995) 1066-1069]</ref>
<ref>[http://dx.doi.org/10.1109/FUSION.1995.534411 A. Pérez et al, ''Current ripple in the coils of the TJ-II Spanish stellarator'', Fusion Engineering, Proc. SOFE 1995. ''Seeking a New Energy Era'', 16<sup>th</sup> IEEE/NPSS Symposium, '''2''' (1995) 1070-1073]</ref>
<ref>[http://dx.doi.org/10.1109/FUSION.1995.534411 A. Pérez et al, ''Current ripple in the coils of the TJ-II Spanish stellarator'', Fusion Engineering, Proc. SOFE 1995. ''Seeking a New Energy Era'', 16<sup>th</sup> IEEE/NPSS Symposium, '''2''' (1995) 1070-1073]</ref>
<ref>[http://dx.doi.org/10.1016/j.fusengdes.2005.06.089 P. Méndez, ''High power IGBT bridge application for the harmonic suppression on the load side of the power supply system of the Spanish Stellarator TJ-II'', Fusion Engineering and Design '''75-79''' (2005) 123-126]</ref>
<ref>[http://dx.doi.org/10.1016/j.fusengdes.2007.05.016 J. Izquierdo et al, ''Reliability of the TJ-II power supply system: Collection and analysis of the operational experience data'', Fusion Engineering and Design '''82''', Issues 15-24 (2007) 2765-2771]</ref>
<ref>[http://dx.doi.org/10.1016/j.fusengdes.2007.05.016 J. Izquierdo et al, ''Reliability of the TJ-II power supply system: Collection and analysis of the operational experience data'', Fusion Engineering and Design '''82''', Issues 15-24 (2007) 2765-2771]</ref>
[[File:TJ-II_flywheel.JPG|400px|thumb|right|The TJ-II flywheel generator]]
[[File:TJ-II_flywheel.JPG|400px|thumb|right|The TJ-II flywheel generator]]

Revision as of 20:44, 23 September 2009

Installation of the TJ-II flywheel generator

The generation of the magnetic field during a TJ-II discharge requires a total amount of power of almost 50 MW. This power is supplied by the national grid and a 140 MW flywheel generator (100 MJ, 15 kV, 100 Hz). As the TJ-II loads require a direct current, a set of thyristor converters, transformers and circuit breakers are used for each coil system. The power requirements range from 5 kA (100 V) to 32 kA (1000 V). The heating systems (ECRH and NBI) load the power supply with additional 15 MW. [1] [2] [3] [4]

The TJ-II flywheel generator

Recently, the configurational flexibility of the TJ-II has been broadened by the commissioning of a new mode of operation that allows magnetic configurations to be varied dynamically during the discharge flat-top. In order to achieve this, new hardware and software features have been added to the TJ-II Control System. [5]