98
edits
Line 29: | Line 29: | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: 2 days. | ||
* Essential diagnostic systems: Rogowski (Ip), Microwave Interferometer, Scattering Thomson (ne & Te), Doppler Reflectometry (Er), ECE (Te), NPA (Ti), MSE (rotational transform) | * Essential diagnostic systems: Rogowski (Ip), Microwave Interferometer, Scattering Thomson (ne & Te), Doppler Reflectometry (Er), ECE (Te), NPA (Ti), MSE (rotational transform) | ||
* Type of plasmas (heating configuration): NBI plasmas with background ECRH power for density control purposes | * Type of plasmas (heating configuration): NBI plasmas with background ECRH power for density control purposes |
edits