TJ-II: Two dimensional distribution of plasma potential and density: Difference between revisions

Line 32: Line 32:
Required resources:  
Required resources:  


• Number of days of operation: 3  
• Number of days of operation: 3
• Essential diagnostic systems: Dual HIBP [May / June]  
• Essential diagnostic systems: Dual HIBP [May / June]
• Type of plasmas (heating configuration): ECRH & NBI  
• Type of plasmas (heating configuration): ECRH & NBI  
• Wall conditioning: Sufficient density control for good reproducibility in NBI plasmas.
• Wall conditioning: Sufficient density control for good reproducibility in NBI plasmas.


345

edits