TJ-II: Studies of pellet plasmoid drift in different magnetic configurations: Difference between revisions

 
Line 27: Line 27:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 1 day of ECRH operation and 2 days of ECRH + NBI operation
* Number of plasma discharges or days of operation: 1 or 2 days of ECRH operation and 1 or 2 days of ECRH + NBI operation
* Essential diagnostic systems: Pellet injector (pellet 1 for ECRH and pellet 3 for NBI), fast camera, TS  
* Essential diagnostic systems: Pellet injector (pellet 1 for ECRH and pellet 3 for NBI), fast camera, TS  
* Type of plasmas (heating configuration): ECRH and NBI 1 + NBI2
* Type of plasmas (heating configuration): ECRH and NBI 1 + NBI2
12

edits