TJ-II: Searching for AEs suppression scenarios using off-axis ECCD: Difference between revisions

Line 35: Line 35:
== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
Preferred dates: No preferred dates at the time  
Preferred dates: No preferred dates at the time  
of the proposal submission(format dd-mm-yyyy)
of the proposal submission
 
(format dd-mm-yyyy)


<!-- DO NOT REMOVE THE FOLLOWING LINES -->
<!-- DO NOT REMOVE THE FOLLOWING LINES -->
98

edits