TJ-II: Pellet induced Enhanced Confinement: the role of Er and turbulence: Difference between revisions

Line 29: Line 29:
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 4 days in total: 2 days (scan in NBI power and magnetic configuration) and 2 days for LCR studies
* Number of plasma discharges or days of operation: 4 days in total: 2 days (scan in NBI power and magnetic configuration) and 2 days for LCR studies
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam.
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Langmuir Probes
* Type of plasmas (heating configuration): NBI#1, NIB#2 and NBI#1+2
* Type of plasmas (heating configuration): ECRH, NBI
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:
* External users: need a local computer account for data access: yes/no
* External users: need a local computer account for data access: yes/no
90

edits