TJ-II: On the physics of the density limit: Difference between revisions

Line 31: Line 31:
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 2
* Number of plasma discharges or days of operation: 2
* Essential diagnostic systems: edge probes, fast camra with triple bundle, HIBP, Doppler and edge biasing
* Essential diagnostic systems: edge probes, fast camera with triple bundle, HIBP, Doppler and edge biasing
* Type of plasmas (heating configuration): NBI where the density limit will be surpassed during density ramps
* Type of plasmas (heating configuration): NBI where the density limit will be surpassed during density ramps
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:
345

edits