TJ-II: Multipellet injection in NBI plasmas: Difference between revisions

Line 32: Line 32:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation:  3 days (scan in NBI scenarios: Co, CNTR and balanced)  
* Number of plasma discharges or days of operation:  3 days (scan in NBI scenarios: Co, CNTR and balanced) and 2 days for scan in magnetic configuration.
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection
* Type of plasmas (heating configuration): ECRH, NBI
* Type of plasmas (heating configuration): ECRH, NBI