33
edits
Line 32: | Line 32: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: 3 days (scan in NBI scenarios: Co, CNTR and balanced) | * Number of plasma discharges or days of operation: 3 days (scan in NBI scenarios: Co, CNTR and balanced) and 2 days for scan in magnetic configuration. | ||
* Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection | * Essential diagnostic systems: TS, HIBP, Doppler Reflectometer, He-Beam, Pellet injection | ||
* Type of plasmas (heating configuration): ECRH, NBI | * Type of plasmas (heating configuration): ECRH, NBI |
edits