TJ-II: Investigation of Pellet Deposition Profiles and Transports in TJ-II using Integrated Predictive Modelling Codes: Difference between revisions

(Created page with "== Experimental campaign == 2019 Autumn == Proposal title == '''TJ-II: Investigation of Pellet Deposition Profiles and Transports in TJ-II using Integrated Predictive Modelli...")
 
 
(One intermediate revision by the same user not shown)
Line 42: Line 42:
<ref> B. Chatthong, T. Onjun, and W. Singhsomroje. "Model for toroidal velocity in H-mode plasmas in the presence of internal transport barriers", Nuclear Fusion 50 (2010) 064009 </ref>
<ref> B. Chatthong, T. Onjun, and W. Singhsomroje. "Model for toroidal velocity in H-mode plasmas in the presence of internal transport barriers", Nuclear Fusion 50 (2010) 064009 </ref>
== International or National funding project or entity ==
== International or National funding project or entity ==
If applicable, enter funding here or write N/A
IAEA Joint Experiment, IAEA Agreement No. 22766/R0 concerning Research Project: “Fusion Physics and Technology Studies at the TJ-II Stellarator”, part of the IAEA Coordinated Research Project 'F13019' entitled ‘Network of Small and Medium Size Magnetic Confinement Fusion Devices for Fusion Research’


== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation: 1 -2 days
* Number of plasma discharges or days of operation: 1 -2 days
* Essential diagnostic systems: Pellet Injection
* Essential diagnostic systems: Pellet Injection systems, Thomson Scattering, ECE, microwave interferometer,
* Type of plasmas (heating configuration): ECRH & NBI
* Type of plasmas (heating configuration): ECRH & NBI
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:
* External users: need a local computer account for data access: yes
* External users: need a local computer account for data access: yes
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? Provide description and integration needs: No


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
154

edits