TJ-II: Injection of TESPELs with compounds or multiple elements of interest for W7-X: Difference between revisions

Line 28: Line 28:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation: Several if piggybacked to pellet or LBO experiments
* Number of plasma discharges or days of operation: 2 days
* Essential diagnostic systems (without which, the proposal cannot be conducted): TESPEL injector and UV-visible spectrometer
* Essential diagnostic systems (without which, the proposal cannot be conducted): TESPEL injector and UV-visible spectrometer
* Other diagnostic system of special interest: Thomson scattering, VUV spectrometer
* Other diagnostic system of special interest: Thomson scattering, VUV spectrometer
Line 34: Line 34:
* Specific requirements on wall conditioning if any: none
* Specific requirements on wall conditioning if any: none
* External users: need a local computer account for data access: no
* External users: need a local computer account for data access: no
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? W7-X fast-frame imaging camera (has been done previously)


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
148

edits