148
edits
Line 28: | Line 28: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: Several if piggybacked to pellet or LBO experiments | ||
* Essential diagnostic systems (without which, the proposal cannot be conducted): TESPEL injector and UV-visible spectrometer | * Essential diagnostic systems (without which, the proposal cannot be conducted): TESPEL injector and UV-visible spectrometer | ||
* Other diagnostic system of special interest: Thomson scattering, VUV spectrometer | * Other diagnostic system of special interest: Thomson scattering, VUV spectrometer | ||
* Type of plasmas (heating and magnetic configuration): | * Type of plasmas (heating and magnetic configuration): NBI (balanced or unbalanced) and 100_44_64 | ||
* Specific requirements on wall conditioning if any: none | * Specific requirements on wall conditioning if any: none | ||
* External users: need a local computer account for data access: no | * External users: need a local computer account for data access: no |
edits