148
edits
Line 36: | Line 36: | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == | ||
Preferred dates: | Preferred dates: mid-May to mid-June | ||
(If remote participation is required or preferred, please, indicate it here. A Zoom connection with the local contact person will be arranged on the day of experiments.) | (If remote participation is required or preferred, please, indicate it here. A Zoom connection with the local contact person will be arranged on the day of experiments.) |
edits