345
edits
Line 40: | Line 40: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
• Number of plasma discharges or days of operation: 3 | |||
• Number of plasma discharges or days of operation: 3 | |||
• Essential diagnostic systems: Dual Langmuir probe system [February, May&June] in TJ-II and HIBP [May & June] | • Essential diagnostic systems: Dual Langmuir probe system [February, May&June] in TJ-II and HIBP [May & June] | ||
• Type of plasmas (heating configuration): ECRH & NBI | • Type of plasmas (heating configuration): ECRH & NBI | ||
• Specific requirements on wall conditioning if any: Sufficient density control for good reproducibility in NBI plasmas. | • Specific requirements on wall conditioning if any: Sufficient density control for good reproducibility in NBI plasmas. | ||
edits