TJ-II: Feed back control of Zonal Flows and turbulence in TJ-II: Difference between revisions

Line 24: Line 24:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation:  
* Number of plasma discharges or days of operation: 2 experimental days
* Essential diagnostic systems:
* Essential diagnostic systems: probes and biasing
* Type of plasmas (heating configuration):
* Type of plasmas (heating configuration):
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:  
* External users: need a local computer account for data access: yes/no
* External users: need a local computer account for data access: yes/no
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? Provide description and integration needs: Feed-back system


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
345

edits