TJ-II: Electric potential and turbulence studies with HIBP and LP via edge biasing: Difference between revisions

Line 34: Line 34:
== Description of required resources ==
== Description of required resources ==
Required resources:
Required resources:
* Number of plasma discharges or days of operation:  
* Number of plasma discharges or days of operation: 1 o 2 days
* Essential diagnostic systems:
* Essential diagnostic systems: Dual HIBP system, Plasma biasing,
* Type of plasmas (heating configuration):
* Type of plasmas (heating configuration): ECRH & NBI
* Specific requirements on wall conditioning if any:
* Specific requirements on wall conditioning if any:
* External users: need a local computer account for data access: yes/no
* External users: need a local computer account for data access: yes
* Any external equipment to be integrated? Provide description and integration needs:
* Any external equipment to be integrated? Provide description and integration needs:


148

edits