TJ-II:Validation of bootstrap predictions: Difference between revisions

no edit summary
No edit summary
 
(2 intermediate revisions by 2 users not shown)
Line 33: Line 33:
We will measure:
We will measure:


- The time evolution of the total current <math><I_t(t)></math> with the Rogowsky coils.
- The time evolution of the total current <math><I_t(t)></math> with the Rogowski coils.


- Two components of the magnetic field at the end of the discharge (when <math><I_t(t)></math> has converged) with the Motional Stark Effect
- Two components of the magnetic field at the end of the discharge (when <math><I_t(t)></math> has converged) with the Motional Stark Effect
Line 54: Line 54:


== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
Preferred dates: (format dd-mm-yyyy):  
Preferred dates: (format dd-mm-yyyy): J. L. Velasco and K. J. McCarthy will be unavailable from 10th to 12th of April (CWGM). K. J. McCarthy will be unavailable from 23rd to 27th of April (W7-X) and on Thursday 17th of May (Erasmus Laboratories).


== References ==
== References ==
Line 71: Line 71:


[[Category:TJ-II internal documents]]
[[Category:TJ-II internal documents]]
[[Category:TJ-II experimental proposals]]
[[Category:TJ-II experimental proposals Spring 2018]]