TJ-II:Validation of ECCD predictions in TJ-II ECRH plasmas: Difference between revisions

Line 48: Line 48:
== Preferred dates and degree of flexibility ==
== Preferred dates and degree of flexibility ==
Preferred dates: due to the availability on-site of the proponents the experimental days should fall out of the calender week 14.
Preferred dates: due to the availability on-site of the proponents the experimental days should fall out of the calender week 14.
A valuable input for this experiment is the L/R time indicated in during the conduction of the proposal "Validation of bootstap predictions" (http://fusionwiki.ciemat.es/wiki/TJ-II:Validation_of_bootstrap_predictions).
 
A valuable input for this experiment regarding the L/R time at similar conditions in the absence of ECCD may result from the conduction of the experimental proposal "Validation of bootstap predictions" (http://fusionwiki.ciemat.es/wiki/TJ-II:Validation_of_bootstrap_predictions). Thus, the present proposal shall be preferably scheduled after that proposal.
124

edits