124
edits
Jose.regana (talk | contribs) |
Jose.regana (talk | contribs) |
||
Line 48: | Line 48: | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == | ||
Preferred dates: due to the availability on-site of the proponents the experimental days should fall out of the calender week 14. | Preferred dates: due to the availability on-site of the proponents the experimental days should fall out of the calender week 14. | ||
A valuable input for this experiment | |||
A valuable input for this experiment regarding the L/R time at similar conditions in the absence of ECCD may result from the conduction of the experimental proposal "Validation of bootstap predictions" (http://fusionwiki.ciemat.es/wiki/TJ-II:Validation_of_bootstrap_predictions). Thus, the present proposal shall be preferably scheduled after that proposal. |
edits