79
edits
Line 36: | Line 36: | ||
* Type of plasmas (heating configuration): NBI (both injectors) and ECH. | * Type of plasmas (heating configuration): NBI (both injectors) and ECH. | ||
* Specific requirements on wall conditioning if any: Good plasma density control usually means that the operation days must be allocated close after the boron/lihium conditioning of the vacuum vessel. | * Specific requirements on wall conditioning if any: Good plasma density control usually means that the operation days must be allocated close after the boron/lihium conditioning of the vacuum vessel. | ||
* External users: need a local computer account for data access: | * External users: need a local computer account for data access: No | ||
* Any external equipment to be integrated? | * Any external equipment to be integrated? No | ||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == |
edits