TJ-II:Construction: Difference between revisions

no edit summary
No edit summary
No edit summary
 
Line 1: Line 1:
[[File:TJ-II_Assembly.jpg|400px|thumb|right|A step in the assembly of TJ-II. The central conductor CC/HX and parts of the [[TJ-II:Sectors|vacuum vessel]] with [[TJ-II:Ports|view ports]] are visible.]]
[[File:TJ-II_Assembly.jpg|400px|thumb|right|A step in the assembly of TJ-II. The central conductor CC/HX and parts of the [[TJ-II:Sectors|vacuum vessel]] with [[TJ-II:Ports|view ports]] are visible.]]


[[TJ-II]] is a highly flexible medium-size fusion device of the Heliac type constructed at [[CIEMAT]] between 1991 and 1997.<ref>A.P. Navarro, L. Almoguera, J. Alonso Gozalo, et al., ''Engineering aspects and present status of the Spanish stellarator TJ-II'', [[doi:10.1109/FUSION.1991.218760| Fusion Engineering, 14th IEEE/NPSS Symposium (1991)]]</ref>  
[[TJ-II]] is a highly flexible medium-size fusion device of the Heliac type constructed at [[CIEMAT]] between 1991 and 1997.
<ref>A. Perea, L. Almoguera, J. Alonso, et al. ''Engineering design of a flexible Heliac device: the TJ-II experiment'', [[doi:10.1016/B978-0-444-88508-1.50023-2|Proc. 16th Symposium on Fusion Technology, London, U.K., 3–7 September 1990, 204]]</ref>
<ref>A.P. Navarro, L. Almoguera, J. Alonso Gozalo, et al., ''Engineering aspects and present status of the Spanish stellarator TJ-II'', [[doi:10.1109/FUSION.1991.218760| Fusion Engineering, 14th IEEE/NPSS Symposium (1991)]]</ref>  
The [[TJ-II:Magnetic surface mapping|magnetic surface mapping]] was measured at low magnetic fields between December 1996 and January 1997, with excellent results. From January to September 1997 the commissioning of the device up to the design values was done, together with the assembly of the basic diagnostic equipment.
The [[TJ-II:Magnetic surface mapping|magnetic surface mapping]] was measured at low magnetic fields between December 1996 and January 1997, with excellent results. From January to September 1997 the commissioning of the device up to the design values was done, together with the assembly of the basic diagnostic equipment.
<ref>M. Blaumoser et al, ''Construction, commissioning and first results of the Spanish Stellarator TJ-II'', [[doi:10.1109/FUSION.1997.687032|Fusion Engineering, Proc. 17<sup>th</sup> IEEE/NPSS Symposium '''1''' (1997) 257 - 260]]</ref>
<ref>M. Blaumoser et al, ''Construction, commissioning and first results of the Spanish Stellarator TJ-II'', [[doi:10.1109/FUSION.1997.687032|Fusion Engineering, Proc. 17<sup>th</sup> IEEE/NPSS Symposium '''1''' (1997) 257 - 260]]</ref>