25
edits
Line 24: | Line 24: | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: We would need at least two operational days: one (compatible with other experiments) to adjust all the variables of the laser blow-off system and another day to perform the experiment. | * Number of plasma discharges or days of operation: We would need at least two operational days: one (compatible with other experiments) to adjust all the variables of the laser blow-off system and another day to perform the experiment. | ||
* Essential diagnostic systems:Main diagnostics will be radiation diagnostics (bolometers, X-rays, VUV spectrometer, etc.) and ECR radiometer data as well as other diagnostics with good time resolution. | * Essential diagnostic systems: Main diagnostics will be radiation diagnostics (bolometers, X-rays, VUV spectrometer, etc.) and ECR radiometer data as well as other diagnostics with good time resolution. | ||
* Type of plasmas (heating configuration):We need standard configuration plasmas (100_44_64). | * Type of plasmas (heating configuration): We need standard configuration plasmas (100_44_64). | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: | ||
1. We want discharges in He in order to study the impurity confinement as a function of effective mass. | 1. We want discharges in He in order to study the impurity confinement as a function of effective mass. |
edits