TJ-II:Neutral Beam Injection: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 6: Line 6:
<ref>[http://www.new.ans.org/store/j_75 J. Guasp, M. Liniers, C. Fuentes, and G. Barrera, ''Thermal load calculations at TJ-II vacuum vessel under NBI,'' Fusion Tech., '''35''', pp. 32-41 (1999)]</ref>
<ref>[http://www.new.ans.org/store/j_75 J. Guasp, M. Liniers, C. Fuentes, and G. Barrera, ''Thermal load calculations at TJ-II vacuum vessel under NBI,'' Fusion Tech., '''35''', pp. 32-41 (1999)]</ref>
<ref>[http://dx.doi.org/10.1016/j.fusengdes.2005.06.315 C. Fuentes et al, Fusion Engineering and Design '''74''', Issues 1-4 (2005) 249-253]</ref>
<ref>[http://dx.doi.org/10.1016/j.fusengdes.2005.06.315 C. Fuentes et al, Fusion Engineering and Design '''74''', Issues 1-4 (2005) 249-253]</ref>
NBI1 is located in [[TJ-II:Sectors|sector]] D8.
NBI2 is located in [[TJ-II:Sectors|sector]] C1.


==References==
==References==
<references />
<references />