TJ-II:Heavy Ion Beam Probe: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 21: Line 21:


A second, similar system is currently being installed in [[TJ-II:Sectors|sector]] A4 (see photo).
A second, similar system is currently being installed in [[TJ-II:Sectors|sector]] A4 (see photo).
[[File:IMG 1627.JPG|350px|thumb|right|Installation of the second HIBP probe (January, 2011)]]
[[File:IMG 1627.JPG|350px|thumb|right|Installation of the second HIBP probe (March, 2011)]]