25
edits
Line 25: | Line 25: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: We would need at least | * Number of plasma discharges or days of operation: We would need at least three operational days: one (compatible with other experiments) to adjust all the variables of the laser blow-off system and two days to perform the experiment. | ||
* Essential diagnostic systems: Main diagnostics will be radiation diagnostics (bolometers, X-rays, VUV spectrometer, etc.) and ECR radiometer data as well as other diagnostics with good time resolution. | * Essential diagnostic systems: Main diagnostics will be radiation diagnostics (bolometers, X-rays, VUV spectrometer, etc.) and ECR radiometer data as well as other diagnostics with good time resolution. | ||
* Type of plasmas (heating configuration): We need standard configuration plasmas (100_44_64). | * Type of plasmas (heating configuration): We need standard configuration plasmas (100_44_64). |
edits