345
edits
Line 32: | Line 32: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: 2 | ||
* Essential diagnostic systems: RFA, Probes | * Essential diagnostic systems: RFA, Probes. HIBP operation is also highly desirable. | ||
* Type of plasmas (heating configuration): ECRH with density ramp-up and ramp-down to include electron-ion root transitions | * Type of plasmas (heating configuration): ECRH with density ramp-up and ramp-down to include electron-ion root transitions | ||
* Specific requirements on wall conditioning if any: no | * Specific requirements on wall conditioning if any: no |
edits