345
edits
Line 26: | Line 26: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
• Number of plasma discharges or days of operation: 3 | |||
• Essential diagnostic systems: Fast cameras and Dual Langmuir probe system in TJ-II. | |||
• Type of plasmas (heating configuration): ECRH & NBI | |||
• Specific requirements on wall conditioning if any: Sufficient density control for good reproducibility in ECRH and NBI plasmas. | |||
== Preferred dates and degree of flexibility == | == Preferred dates and degree of flexibility == |
edits