345
edits
Line 32: | Line 32: | ||
Required resources: | Required resources: | ||
• Number of days of operation: 3 | • Number of days of operation: 3 | ||
• Essential diagnostic systems: Dual HIBP [May / June] | |||
• Essential diagnostic systems: Dual HIBP [May / June] | |||
• Type of plasmas (heating configuration): ECRH & NBI | • Type of plasmas (heating configuration): ECRH & NBI | ||
• Wall conditioning: Sufficient density control for good reproducibility in NBI plasmas. | • Wall conditioning: Sufficient density control for good reproducibility in NBI plasmas. | ||
edits