345
edits
Line 23: | Line 23: | ||
== Description of required resources == | == Description of required resources == | ||
Required resources: | Required resources: | ||
* Number of plasma discharges or days of operation: | * Number of plasma discharges or days of operation: 3 days | ||
* Essential diagnostic systems:edge probes and HIBP | * Essential diagnostic systems:edge probes, Doppler and HIBP | ||
* Type of plasmas (heating configuration): ECRH in electron and ion root scenarios | * Type of plasmas (heating configuration): ECRH in electron and ion root scenarios | ||
* Specific requirements on wall conditioning if any: | * Specific requirements on wall conditioning if any: | ||
Line 31: | Line 31: | ||
== Preferred dates and degree of flexibility ==20-05-2018 | == Preferred dates and degree of flexibility ==20-05-2018 | ||
== References == | == References == |
edits